Логотип Севмаша

30 Dec, memorries of this day.

December 30, 2005

President of GRTCAS D.G. Pashaev was elected at Public Chamber of the RF from social organizations of Russian North-West region

December 30, 2000

Results of the competition of journalists «People of XX century» for all history of Severodvinsk were summed up, the victors were admitted:• among industry men – E.P. Egorov, former director of Sevmash• among military men – V.L. Berezovsky, kontr-admiral, the Hero of the Soviet Union• among socially-political men – N.G. Orlov, former head of Town executive committee, then deputy of GDO at Sevmash• among culture, enlightenment, medicine – L.I. Chernjaeva, investigator of the region

December 30, 1998

Results of the competition of journalists «Person of the year» were summed up, the victor was admitted G.L. Prosjankin (posthumously) – former director of Sevmash

December 30, 1996

Built at PO «North Machine-Building Enterprise» the eleventh – last NPS of project no. 949A (plant no.663, board no. K-150, since 13.04.1993 – «Tomsk») was brought in the system of Navy fleet

December 30, 1995

The competition of journalists «Person of the year» was renewed, the victor was admitted General director of SUE PO «North Machine-Building Enterprise», the Hero of Russia D.G. Pashaev

December 30, 1994

Built at PO «North Machine-Building Enterprise» the tenth NPS of project no. 949A (plant no.662, board no. K-141, since 06.04.1993 – «Kursk») was brought in the system of Navy fleet

December 30, 1992

Built at PO «North Machine-Building Enterprise» the eighth NPS of project no. 949A (plant no.650, board no. K-266, since 06.04.1993 – «Orel») was brought in the system of Navy fleet. Built at PO «North Machine-Building Enterprise» the fourth NPS of project no. 971 (plant no.832, board no. K-328, since 21.01.1991 – «Leopard») was brought in the system of Navy fleet.

December 30, 1988

Built at PO «North Machine-Building Enterprise» the third NPS of project no. 949A (plant no.619, board no. K-132, since 13.04.1993 – «Irkutsk») was brought in the system of Navy fleet

December 30, 1985

Built at PO «North Machine-Building Enterprise» the second NPS of project no. 667BDRM (plant no.380, board no. K-84, since 09.02.1999 – «Ekaterinburg») was brought in the system of Navy fleet

December 30, 1980

At «North Machine-Building Enterprise» the prototype NPS of project no. 949 (plant no. 605, board no. K-525, since 06.04.1993 – «Arkhangelsk») was given to Navy fleet.The first NPS of the third generation.The first NPS, built in specially created for ships of the third generation, workshop No.55 of «North Machine-Building Enterprise».The highly speed NPS, armed 24 winged missiles, which can inflict many-points blow to aircraft unites of enemy from big distances.At «North Machine-Building Enterprise» two NPS of project no. 949 and eleven NPS of modernized project no. 949A were built

December 30, 1977

At «North Machine-Building Enterprise» the seventh NPS of project no. 667BDR (plant no.392, board no. K-496, since 11.01.1999 – «Borisoglebsk») was given to Navy fleet

December 30, 1976

Built at «North Machine-Building Enterprise» the prototype NPS of project no. 667BDR (plant no.355, board no. K-424) with 16 ballistic missiles on the board was given to Navy fleet. Firstly fighting missiles with dividing militant charges were arranged at NPS.In whole, in Severodvinsk 14 NPS of this project were built At «North Machine-Building Enterprise» the fourth NPS of project no. 667BDR (plant no.368, board no. K-455) was given to Navy fleet

December 30, 1975

Built at «North Machine-Building Enterprise» the third and the fourth NPS of project no. 667BD (plant no.353 and 354, board no. K-193 and K-421) were brought in the system of Navy fleet. So, during one year the prototype and three serial NPS of 667BD project were given to Navy fleet

December 30, 1974

State Committee at the head of deputy of ministry of shipbuilding industry I.S. Belousov signed act of brining in service one of the fundamental production objects of «North Machine-Building Enterprise» – workshop no.55, gigantic slipway, in which four Isakievsky Sobor would be placed. Length of the slipway – 432 m, width –130 m, height – more than 70 m. Only for four years this complicated technical construction was built

December 30, 1973

Built at «North Machine-Building Enterprise» the fourth and the fifth NPS of project no. 667B (plant no.324 and 325, board no. K-385 and K-457) were brought in the system of Navy fleet

December 30, 1970

At «North Machine-Building Enterprise» the seventeenth NPS of project no. 667A (plant no.442, board no. K-415) was given to Navy fleet

All dates

Сайт рзработан PAPAFERD